VISHTIK / SOLAR ENGINEERING OPERATIONS
From solar proposals and site surveys to PV permit plans, PE review, AHJ coordination and PTO. One connected engineering delivery path for U.S. installers & EPCs.
Solar Permit Plan Sets · Engineering Review · All 50 U.S. States
ENGINEERING MODEL / 2D ↔ 3D
PROPOSAL → PTO
INPUT
Verified roof/equipment
DESIGN
Array + plan-set scope
OUTPUT
Review + AHJ support
Conceptual engineering visualization—not an issued drawing. Explore real permit plans ↗
ONE PROJECT / SIX CONNECTED ENGINEERING SERVICES
Layout + yield
Site + equipment
Site plans + SLD
Structural + electrical
Submit + revisions
Utility + PTO
25,000+
Systems designed
2,000+ MW
Capacity designed
50 States
US project coverage
ABOUT VISHTIK
Established in 2020, Vishtik supports solar installers and EPCs across the United States. We bring design, engineering review and utility coordination together—helping your team move each project forward.
01
Design, PE review and utility support work together across your project.
02
Plan sets and engineering documents built around project requirements.
03
From proposal and surveys to review support and project closeout.
Solar design, review and delivery support.
2020
Established
United States
Project focus
From proposal to PTO. Choose the support your team needs.
01 / PRE-SALE
Give your sales team a clear solar proposal for the customer conversation. Bring the proposed system, estimated production and project value into one presentation.
WHAT YOU GET
• Proposed system layout
• Production & savings estimates
• Customer-ready presentation
100k+
Proposals Delivered
99%
SLA Compliance
30 min.
Turnaround Time
02 / PROJECT INPUTS
Capture the site information your design team needs before drawings begin. Document roof conditions and electrical equipment to reduce avoidable information gaps.
WHAT YOU GET
• Roof & site documentation
• Electrical equipment photos
• Design input collection
48+
States Covered
98.7%
Approval Rate
72 Hr*
Turnaround Time
03 / PLAN SETS
Get project-specific drawings organized for AHJ and utility review. Keep site layouts, electrical details and equipment information together in a coordinated plan set.
WHAT YOU GET
• Site & roof plans
• Electrical diagrams
• Equipment specifications
25k+
Designs Delivered
98.7%
First-time Approval
12* Hours
Turnaround Time
04 / ENGINEERING REVIEW
Coordinate professional engineering review for your solar project. Structural and electrical documentation is reviewed against the project scope before stamping or letters are issued.
WHAT YOU GET
• Structural & electrical review
• PE stamps where required
• Engineering letters
50k+
Stamping
98.7%
First-time Approval
6 Hours
Turnaround Time
05 / UTILITY COORDINATION
Keep utility paperwork and follow-ups moving toward permission to operate. Get support with interconnection documents, review requests and the final PTO handoff.
WHAT YOU GET
• Interconnection documentation
• Utility review coordination
• PTO follow-up support
100+
Per day
98.7%
First-time Approval
800+
Utilities
06 / AHJ COORDINATION
Keep permit submissions and review comments organized. Get support with filing, status tracking and correction coordination so your team can focus on installation.
WHAT YOU GET
• Permit submission support
• Application status tracking
• AHJ comment coordination
100+
Per Day
98.7%
Fiest-time Approval
10000+
AHJs
From residential rooftops and commercial portfolios to energy storage, utility-scale solar, and EV infrastructure, Vishtik delivers coordinated engineering support across the complete project lifecycle.
Rooftop PV / home energy projects
Rooftop / carport / C&I
Storage-ready engineering
Ground-mount / large systems
EV charging infrastructure
We understand that selecting the right solar engineering partner is crucial for the success of your project. Our commitment to excellence in Cost, Time, Quality, and Project Management sets us apart in the industry.
VT360 gives your operations team real-time status across every active project, permit design, QC stage, PE review, correction cycles and PTO progress, all tracked in one place.
Site data, scope and utility inputs enter one queue.
Missing details are flagged before design begins.
Plan sets are checked against code and AHJ needs.
Reviews and corrections stay visible in the portal.
Utility documents and milestones close the file.
We’ll review your inquiry and respond within one business day. Required fields are marked *.
Prefer a call?
+1 (307) 800-0424