The contract’s signed. The crew’s scheduled. And the whole job is parked in a city portal, waiting on a plan checker you can’t reach. Every day it sits, your cash and your install calendar sit with it.
7,000+ jurisdictions, each with its own forms, codes, portal and fees. Miss one detail and the package bounces.
A single correction can mean another full review cycle days or weeks before anyone gets on the roof.
Once it’s submitted, you’re calling the city for status and hoping. Your customer’s asking, and you don’t have an answer.
Every new market means learning a new set of AHJ rules from scratch, time your team doesn’t have.
Vishtik knows the jurisdictions, files the package, tracks it, and clears the corrections, so permitting stops being the thing that slows your installs down.
Not just paperwork handed back to you. We prepare it, file it, follow it, and fix it, so your team never touches a city portal.
Cover sheets, site and electrical plans and compliance docs, built to the exact AHJ, not a generic template.
We file the complete set with the AHJ. Every document and form, not just the drawings, by SolarAPP+, or in person, however the jurisdiction takes it.
Every permit’s status, live in VishtikOS, no calling the city, no guessing where it stands.
When comments come back, we answer them with code references and resubmit, free until it’s approved.
NEC and local code checked across the package before it ever reaches a plan checker.
Permit fees, business license and contractor registration paperwork handled per jurisdiction.
The full package goes in under one submission, so the jurisdiction has everything it needs to review and approve.
Most permitting delays come from not knowing what a city wants before you submit. We keep the submittal rules, code amendments, forms and quirks for thousands of AHJs on file, so the package is right the first time, not after the second rejection.
Forms, codes and submittal rules on file.
Interconnection requirements ready.
Online portal, SolarAPP+ or offline.
From a single home to large commercial sites.
Not a pile of files and a “good luck.” A filed, tracked permit you can follow end to end.
The full submission set, assembled to your AHJ’s exact standard.
Your complete document set, submitted to the AHJ with confirmation, SolarAPP+ or offline.
Proof the package was checked against NEC and local code.
Every permit tracked in VishtikOS, visible to your whole team.
Comments answered and resubmitted, with the history kept.
The end goal is your permit, cleared and ready to build.
Most permitting vendors are a ticket factory, you throw a project over the wall and wait. Vishtik works like part of your team: we know the jurisdiction, we file it, we chase it, and we own the outcome.
Thousands of jurisdictions on file with their submittal rules and code amendments, not guesswork.
We file it online or offline. Your team stays on the roof, not in a city portal.
Live status in VishtikOS. No calling the city, no wondering where it stands.
We handle comments and resubmittals, free until the permit is approved.
A partner that owns the result, not a queue you’re waiting in line behind.
Move into new markets without learning a new set of AHJ rules yourself.
A clear path, with us owning the parts that usually stall, so you always know where your permit stands.
We pin down the exact jurisdiction and pull its codes, forms and submittal rules.
Cover sheet, plans and compliance docs assembled to that AHJ’s standard.
Filed the way the jurisdiction takes it weather online portal, SolarAPP+ or offline.
Live status in VishtikOS, with us following up so it doesn’t sit in a queue.
Comments answered, resubmitted, and tracked through to the approved permit.
Frequently Asked Questions
Permit design is the engineered plan set. Permitting is getting it filed and approved — submission, tracking and corrections. We do both; this page is the filing-and-approval side.
Yes. We file the package the way your jurisdiction requires — online portal, SolarAPP+ or offline — and track it from there.
We handle them — code-referenced responses and resubmittal — and it stays free until the permit is approved.
Yes. Every permit’s status is live in VishtikOS, visible to your whole team.
Yes — permit fees, business licenses and contractor-registration paperwork, handled per jurisdiction.
The proposal is the start. Vishtik runs the engineering and approvals that turn a signed deal into an energized system.
PV, ESS and PV + ESS plan sets for homes.
Rooftop, carport, ground-mount and storage.
Permit and electrical design for EV charging.
Structural and electrical stamps in all 50 states.
Jurisdiction-specific packages, filed and tracked to approval.
Utility applications tracked through to Permission to Operate.