Most AHJs require permit drawings for EV charger installations, including a load calculation, a single-line diagram, and equipment specs. Commercial charging stations may also need site plans, accessibility layouts, and PE stamps. Vishtik prepares residential and commercial EV charger permit sets nationwide.
Residential vs commercial EV charger permits
| Residential | Commercial | |
|---|---|---|
| Typical chargers | Level 2 | Level 2 banks, DC fast chargers |
| Load calculation | Dwelling service load calculation | Service and feeder calculations, demand analysis |
| Drawings | Single-line diagram, equipment location | Site plan, single-line, panel schedules, details |
| Accessibility | Not usually required | Accessible spaces and routes per local code |
| PE stamps | Sometimes | Often EE; SE for canopies and foundations |
| Utility coordination | Rarely | Often, for service upgrades |
Load calculations and service upgrades
NEC 220.57 sets how EV charging load is counted in the service calculation: the larger of 7,200 W or the charger’s nameplate rating. EV chargers are treated as continuous loads, so the branch circuit and overcurrent protection are sized at 125% of the maximum load. If the calculation exceeds the service rating, the options are a service upgrade or load management.
Solar + EV + battery projects
Adding a charger to a solar or storage system changes the load calculation, the interconnection, and sometimes the rapid shutdown and labeling. We design all three together so the permit set is consistent. See EV charger integration with solar.
What’s included
| Deliverable | Residential | Commercial |
|---|---|---|
| Load calculation | Yes | Yes |
| Single-line diagram | Yes | Yes |
| Equipment location plan | Yes | Yes |
| Site plan with parking layout | No | Yes |
| Panel schedules | If needed | Yes |
| EE / SE PE stamps | If required | If required |
What to send for a quote
- Charger model and quantity
- Main panel photo and service size
- Planned charger location
- For commercial: site plan or aerial, utility bill, and number of parking spaces