For a free trial of our Solar Engineering Services - Sign Up Now Try for free

+1 (307) 800-0424

How to get a permit to install solar panels?

How to get a permit to install solar panels?

In most U.S. jurisdictions, installing solar panels requires a permit from the local Authority Having Jurisdiction (AHJ). This process ensures that the installation meets building, electrical, and fire safety codes. The application typically includes engineering drawings, equipment datasheets, and forms for both the AHJ and your utility provider. Partnering with an experienced solar permit service provider like Vishtik can make the process smoother and faster. 

Steps to Get a Permit 

1) Research your AHJ requirements 

– Each city, county, or municipality sets its own permitting requirements. Check if your AHJ participates in automated approval platforms like SolarAPP+.

2) Prepare system design & engineering documents 

– Include site plan, electrical single-line diagram (SLD), equipment cut sheets, and structural calculations. Vishtik can provide stamped plan sets to meet AHJ standards. 

3) Complete the application forms 

– Some AHJs require specific declarations or contractor licenses. 

4) Submit application & fees 

– Submit online via AHJ portal or in person. SolarAPP+ submissions may get instant approval if eligible.

5) Plan review & revisions 

– AHJ reviews documents for compliance. Address any comments quickly to avoid delays. 

6) Approval & installation 

– Once approved, install according to approved plans and schedule inspections. 

Why Permits Are Important 

Permits ensure your solar installation is safe, structurally sound, and code-compliant. They protect homeowners, contractors, and utilities, and are often required for incentives like net metering or tax credits. 

Common Documents Required 

– Site plan with panel layout
– Electrical single-line diagram
– Structural load calculations
– Equipment datasheets
– Fire setback compliance diagram
– Contractor license and insurance details 

Vishtik’s Role in the Permit Process 

Vishtik streamlines the permitting process by:
– Providing permit-ready, stamped plan sets.
– Handling multi-state AHJ requirements.
– Delivering designs in as little as 12 hours.
– Supporting SolarAPP+ submissions. 

FAQ 

Q: Can I install solar panels without a permit?
A: In most jurisdictions, no — you risk fines and removal orders.

Q: How much does a solar permit cost?
A: Costs vary by AHJ but can range from $100 to $500+.

Q: How long does permit approval take?
A: From same-day (SolarAPP+) to several weeks for manual reviews.

Q: What happens if my permit is rejected?
A: You can resubmit after making corrections; Vishtik can help address AHJ comments. 

Share on Facebook
Share on Twitter
Share on LinkedIn
Share on WhatsApp

Let’s Stay in Touch

Subscribe to our newsletter & never miss our latest news and promotions.

+21K people have already subscribed

Book a Free Demo

Please Share Your Contact Detail.